This thing called a box drain will never be the same again. As an item of lowly, but indispensable, preventive infrastructure, it has till now been noted more for its absence. Even without flooding, ...
Till date, 1,987 metres of the box drain has been completed The report said nearly 77% of the box drain proposed to be constructed has already been completed till date and the rest is targeted to be ...
Cuttack: The Orissa high court on Thursday directed the Water Corporation of Odisha (Watco) to explain the rationale behind reducing by around 810 metres the length of the box drain planned under the ...
I have a drain outside my garden floor door to the backyard. It connects to the sewerline underground – the pipe that enters the backwall to the house – that also is connected from the pipe that runs ...
一些您可能无法访问的结果已被隐去。
显示无法访问的结果
反馈