资讯

Drydocks did not say which FPSO project exactly Kanfa would be delivering the module for. Offshore Engineer has reached out to the company, seeking more details on this.
Total of 13 topsides modules for field's eighth FPSO will go to South Korea for hull integration ...
The module was delivered to Singapore for integration into the FPSO vessel, and commissioned with Expro assistance. First oil from the Galoc field was delivered on October 9.
COOEC delivers its first key module for Brazil FPSO Total of 13 topsides modules for field's eighth FPSO will go to South Korea for hull integration COOEC chairman Wang Zhangling.Photo: COOEC ...
SHANGHAI - An innovative floating, production, storage, and offloading (FPSO) vessel equipped with a carbon capture and storage facility has been completed in Shanghai, according to Science and ...
The Steam Boiler module will be installed on the Aoka Mizu FPSO. (Photo: Bluewater) PARAT Halvorsen AS will fabricate a complete, turnkey electrical steam boiler module for the Aoka Mizu FPSO ...
Mammoet prepares for integration of modules for the P-76 FPSO (floating production, storage and offloading) facility in Brazil.
Petroleo Brasilierio SA (Petrobras) reported that the Cidade de Marica floating production, storage, and offloading vessel is berthed at Brasa shipyard in Niteroi, Rio de Janeiro state, Brazil for ...
Conversion work on the hull and some module integration was completed in China before Cidade de Marica set sail for Brazil in April.